Engineering · Procurement · Construction — Maracaibo, since 1981

Projects

F-352 and F-365 crude oil heaters, Campo Boscán

Installation of crude oil heaters at the PLD-Z9 and PLD-3 dehydration plants in Campo Boscán.

Installation of the F-352 crude oil heater at the PLD-Z9 Dehydration Plant and the F-365 at the PLD-3 Dehydration Plant in Campo Boscán: lifting and erection of the equipment, foundations and the associated mechanical, electrical and instrumentation works.