Installation of the F-352 crude oil heater at the PLD-Z9 Dehydration Plant and the F-365 at the PLD-3 Dehydration Plant in Campo Boscán: lifting and erection of the equipment, foundations and the associated mechanical, electrical and instrumentation works.







